Projects, field service and aftermarketon one record per unit, from first drawing to retrofit.

For makers of flares, burners, thermal oxidizers and other combustion and emissions equipment: projects through commissioning, global field service, turnarounds and a 24-hour aftermarket — connected, measured and run on Mars.

Project P-2291 · Unit F-204

Elevated flare system, engineered to order

On track
  1. Engineering
  2. Procurement
  3. Fabrication
  4. FAT
  5. Dispatch
  6. Install
  7. Commissioning
  8. Aftermarket

Engineering

GA drawing rev C · approved with comments

Industries we serve:
the plants your customers run.

Where equipment makers lose time:
projects, service and quality run on email and spreadsheets.

Hundreds of projects a year, technicians on several continents, turnarounds with fixed windows and a rapid-response promise — held together by email and spreadsheets.

A welder fabricating a steel assembly, sparks flying

Every unit is one of a kind. Its paperwork shouldn’t be.

A 24-hour promise on a manual process

Emergency enquiries arrive by phone and email. Finding the unit’s data sheet, the stock and a price takes the hours the customer doesn’t have.

Technicians spread across continents

Who has the right product skill, a valid certificate, a site induction and a visa for that country — the answer lives in someone’s spreadsheet.

Turnaround windows don’t move

A tip, a pilot or a crane that isn’t ready on day one costs the customer a shutdown day — and costs you the next job.

Every project reinvents its paperwork

Drawing approvals, FAT packs, record books and turnover documents are assembled by hand from email threads.

Quality evidence is scattered

Test data, photos, NCRs and supplier certificates sit in different folders when the customer — or an auditor — asks for them.

Acquisitions add another way of working

Each new product line and site brings its own tools, so no one sees projects, service and aftermarket in one view.

What’s included:
six core modules and six optional extensions.

Each module runs on the same records — the unit, the site, the customer, the technician — so the next one starts with the data the last one created.

Core

Extensions

Core module

Project Lifecycle

Every engineered-to-order unit from first drawing to handover.

  • Milestones across engineering, procurement, fabrication, FAT, dispatch and commissioning
  • Drawing submissions with customer approval status and revisions
  • Shipping readiness: packing lists, crating, export documents
  • Commissioning punch list per unit, signed off into the aftermarket

Aftermarket and rapid response: a timed 24-hour reply to every enquiry.

Every enquiry gets a response clock the moment it arrives. The quote starts from the installed unit’s own record, and stock is checked across every region before a price is sent.

  • Emergency and planned enquiries in one queue
  • Other makers’ equipment supported from the same record
  • Overnight shipping from whichever region holds stock
  • Response time measured per region and per account

Enquiries · 24-hour response clock

  • ENQ-8812Emergency3.5h left

    Flare tip replacement · emergency · Gulf Coast

  • ENQ-8809Planned9h left

    Pilot assemblies × 3 · other-OEM unit · Middle East

  • ENQ-8803Planned17h left

    Burner tune-up & spares · South Asia

Tip assembly · stock by region

0

Americas

2

Middle East

5

Asia

Quote sent in 2h 40m · ships overnight from Middle East stock.

Field service: the right technician, with valid certificates and visa.

A work order lists what the job needs. Mars shows who has the product skill, a valid certificate, the site induction and the visa — and sends the job pack to their phone.

  • Matching by skill, certification, induction and permit
  • Expired documents block the assignment, not the job
  • Daily logs, photos and readings from site
  • Report signed by the customer before the technician leaves
Work order WO-5530 · startup & commissioningNeeds 1
Product skillCertificationSite inductionVisa / permit
  • A. RahmanSenior combustion tech
  • L. OrtegaStartup engineer
  • P. NairField technician

A. Rahman assigned · travel, site pass and job pack sent to the phone.

Turnarounds: parts, crews and equipment ready before the shutdown starts.

Scope freezes weeks before the shutdown. Every part, crew, crane and rental unit has a readiness status, and anything that slips raises an escalation while there is still time to act.

  • Readiness board per turnaround
  • Parts, people and equipment planned together
  • Escalation when an ETA moves
  • New work found during the job recorded and quoted

Site turnaround · flare & burners

Window opens in 21 days · scope frozen

85%

ready

  • Flare tip (refurbished)Shipped
  • Pilot assemblies × 3In stock
  • Ignition panel sparesOn order · ETA 6 days
  • Crew of 6 + craneBooked
  • Rental flare (temporary)Mobilising

Ignition spares land 15 days before the window — escalation set if the ETA slips.

Quality and compliance: inspections, test data and NCRs recorded as work happens.

Inspection checklists and FAT test points capture data and photos as they are done. Non-conformances move through root cause, corrective action and approval — and every step is signed.

  • FAT witnessed in person or by livestream
  • NCRs from shop, field and suppliers
  • Record books assembled automatically
  • Complete audit trail with e-signatures

FAT · witness test points

  • Dimensional check
  • Weld NDE
  • Pilot ignition
  • Flame stability · 10:1 turndown
  • Emissions at design rate

Customer witnessed by livestream · test pack issued with signatures.

NCR-0417 · supplier gasket spec

Raised at incoming inspection · lot on hold

  1. 1Raised
  2. 2Root cause
  3. 3Corrective action
  4. 4Approved

Closed · every step signed and kept in the audit trail.

Installed base and retrofits: the full service history of every unit.

Commissioning hands the unit to the aftermarket with its data sheets and spares list. Each visit, inspection and part adds to its history — and ageing units or new regulations surface the next retrofit.

  • One record per unit, per site
  • QR tag opens it in the field
  • Spares kits recommended from the unit itself
  • Retrofit opportunities flagged before the customer asks

Unit F-204 · elevated flare

Scan the tag on site → full history

  1. Year 0 · Commissioned · data sheet & drawings filed
  2. Year 2 · Pilot replacement · spares kit restocked
  3. Year 4 · Drone inspection · tip wear flagged
  4. Year 5 · Turnaround · tip refurbished
  5. Next · Low-NOx retrofit opportunity · regulation due
A refinery on the waterfront with its stacks

Refineries & petrochemicals

Turnarounds planned before the window opens.

An offshore platform with a supply vessel alongside

Onshore and offshore

Technicians cleared and equipped for every site.

A processing plant with stacks under a cloudy sky

Every unit, every site

History, spares and the next retrofit in one record.

A unit’s life on one record:
from project and testing to service and retrofit.

  1. Project
  2. FAT
  3. Dispatch
  4. Commissioning
  5. Installed base
  6. Service & turnarounds
  7. Retrofit

Each retrofit starts a new project — on the same unit record.

Management dashboards:
projects, service and quality on one screen.

Response times, on-time shipment, first-time fix, open NCRs and utilisation — by region, product family and customer, from the same records the work runs on.

Operations · this quarterIllustrative

96%

Responded within 24h

91%

On-time shipment

88%

First-time fix

14

Open NCRs

78%

Technician utilisation

64%

Rental fleet on hire

Median hours to first response · by region

  • Americas5.2h
  • Middle East3.8h
  • Europe6.1h
  • Asia-Pacific7.4h

Common questions
from equipment makers.

Other solutions
on the same platform.

Run projects, service and aftermarket
on one record per unit.

See your projects, field service, turnarounds and aftermarket running on one record per unit.